Obtain all necessary permits. Work with BPA EC lead, Invasive species management and prevention |
B: 165. Environmental Compliance |
|
04/30/2020 |
04/10/2020 |
Effective implementation management and timely contract administration |
C: 119. Administrative Oversight of the Chief Joseph Hatchery M&E Program |
|
04/30/2020 |
04/30/2020 |
A dataset on rotary screw trap operations and a section of the Annual Report |
D: 157. Assessing Summer/Fall Chinook Outmigrants with a Rotary Screw Trap on the Okanogan River |
|
01/31/2020 |
01/31/2020 |
Present juvenile outmigration results at the APR and update status and trends in annual report |
E: 162. Analyze Juvenile Chinook Outmigration |
|
04/30/2020 |
04/23/2020 |
Upload PIT tag files to PTAGIS |
F: 158. Collect and PIT Tag Natural-Origin Juvenile Summer Chinook Salmon |
|
08/16/2019 |
07/08/2019 |
Update key assumptions in ISIT, presentation at APR and section of annual report. |
G: 162. Estimate Spring and Summer Chinook Migration and Survival Using Pit Tags |
|
04/30/2020 |
03/31/2020 |
Produce accessible, error-checked datasets |
H: 157. Conduct Spring Chinook Spawning Ground Surveys in the Okanogan Tributaries |
|
04/30/2020 |
03/31/2020 |
Conduct trapping and monitor Okanogan weir operations and section of the Annual Report |
I: 157. Okanogan River Temporary Weir Operations |
|
04/30/2020 |
04/17/2020 |
Present results at the APR and generate a section of the annual report for weir monitoring. |
J: 162. Analyze Results of Weir Monitoring |
|
03/31/2020 |
03/31/2020 |
Produce accessible, error-checked datasets and section of the Annual Report |
K: 157. Monitor Natural Juvenile Spring Chinook Productivity |
|
04/30/2020 |
03/13/2020 |
Produce accessible, error-checked datasets and section of the Annual Report |
L: 162. Analyze Juvenile Spring Chinook Productivity |
|
04/30/2020 |
03/09/2020 |
Produce accessible, error-checked datasets |
M: 157. Conduct Summer/Fall Chinook Redd Surveys on the Okanogan and Similkameen Rivers |
|
04/30/2020 |
02/28/2020 |
Produce accessible, error-checked datasets |
N: 157. Conduct Summer/Fall Chinook Carcass Collection on the Okanogan and Similkameen Rivers |
|
03/31/2020 |
03/20/2020 |
Spawning ground survey summary and analysis for APR presentations, ISIT, and the annual report |
O: 162. Analyze Data for Summer/Fall Chinook Spawning Ground Surveys |
|
04/30/2020 |
04/10/2020 |
Produce accessible, error-checked datasets |
P: 157. Collect Water for eDNA |
|
04/30/2020 |
04/30/2020 |
APR presentation and section of the annual report |
Q: 162. Analysis of Water Samples for eDNA |
|
04/30/2020 |
04/17/2020 |
Produce accessible, error-checked datasets and tissue samples for CRITFC |
R: 157. Collect Tissue Samples for PBT |
|
11/29/2019 |
11/25/2019 |
Hatchery APR presentation and a section of the annual report |
T: 162. Determine Composition of PRD Fall Chinook in Integrated Broodstock |
|
04/30/2020 |
|
Produce accessible, error-checked datasets |
U: 157. Collect Scales from CJH Summer/Fall Broodstock |
|
03/31/2020 |
03/13/2020 |
Hatchery APR presentation and a section of the annual report |
V: 162. Determine Age Structure of Integrated Broodstock |
|
04/30/2020 |
04/17/2020 |
Produce error-checked dataset and archived in CJH database and uploaded into RMIS |
W: 157. Process Coded Wire Tag Snouts in a Lab |
|
04/30/2020 |
04/30/2020 |
Produce accessible, error-checked datasets of tribal creel |
X: 157. Estimate Tribal Harvest for Summer/Fall Chinook |
|
12/31/2019 |
12/13/2019 |
Data summary and analysis input to ISIT, presented at APR and a section of the annual report |
Y: 162. Retrieve and Analyze CWT Information for Okanogan Summer/Fall Chinook |
|
04/30/2020 |
04/17/2020 |
Maintenance and enhancement of the CJH M&E and Harvest applications and reporting tools with data storage backup |
Z: 160. Database and Module Maintenance and Enhancement |
|
04/30/2020 |
04/30/2020 |
CJHP Annual Program Review Tool Updates and Maintenance |
AA: 162. Assimilate and Analyze ISIT Input Parameters |
|
04/30/2020 |
04/24/2020 |
2020 Annual Program Review (APR) and section of the annual report |
AB: 161. Annual Program Review |
|
04/30/2020 |
04/23/2020 |
Completed Annual Report |
AE: 132. PLACEHOLDER-Submit 2018 Annual Report |
|
04/30/2020 |
|
Completed Annual Report |
AF: 132. PLACEHOLDER: 2017 Annual Report- Finalize Annual Report from Previous Contract |
|
12/31/2019 |
11/13/2019 |